(Click to open topic with navigation)
Z.87.1 Introduction
This test determines if the job can be restarted after a checkpoint hold.
Z.87.2 Test Steps
Assuming the steps of Test 1 (see Test 1 - Basic Operation), issue a qrls command. Have another window open into the
Z.87.3 Successful Results
After the qrls, the job's output should resume.
Related Topics