5.653 Test 3 - Restart After Checkpoint

5.653.1 Introduction

This test determines if the job can be restarted after a checkpoint hold.

5.653.2 Test Steps

Assuming the steps of Test 1 (see Test 1 - Basic Operation), issue a qrls command. Have another window open into the /var/spool/torque/spool directory and tail the job.

5.653.3 Successful Results

After the qrls, the job's output should resume.

Related Topics 

© 2016 Adaptive Computing