Appendices > Appendix M: BLCR acceptance tests > Test 3 - Restart after checkpoint

M.4 Test 3 - Restart after checkpoint

Introduction

This test determines if the job can be restarted after a checkpoint hold.

Test steps

Assuming the steps of Test 1 (see Test 1 - Basic operation), issue a qrls command. Have another window open into the /var/spool/torque/spool directory and tail the job.

Successful results

After the qrls, the job's output should resume.

Related topics