You are here: Appendices > Appendix M: BLCR Acceptance Tests > Test 3 - Restart After Checkpoint

M.5 Test 3 - Restart After Checkpoint

M.5.1 Introduction

This test determines if the job can be restarted after a checkpoint hold.

M.5.2 Test Steps

Assuming the steps of Test 1 (see Test 1 - Basic Operation), issue a qrls command. Have another window open into the /var/spool/torque/spool directory and tail the job.

M.5.3 Successful Results

After the qrls, the job's output should resume.

Related Topics 

© 2017 Adaptive Computing